Home ProductsStud And Track Roll Forming Machine

Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine

Certification
China Jiangsu Lebron Machinery Technology Co., Ltd. certification
China Jiangsu Lebron Machinery Technology Co., Ltd. certification
Customer Reviews
Nice factory. Nice service!!!!

—— Nick

Lebron-Machinery is a very good company!

—— Kadasanwan

I'm Online Chat Now

Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine

Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine
Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine

Large Image :  Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine

Product Details:
Place of Origin: China
Brand Name: Lebron-Machinery
Certification: CE/CAS/Soncap Certificate
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: USD 15000~25000 per Set
Packaging Details: Export sea worthy packing with each machine fixed and protected in the container
Delivery Time: 30 days
Payment Terms: L/C, T/T
Supply Ability: 20 Sets per Month

Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine

Description
Main Power: 4.0KW Hydraulic Power: 4.0KW
Suitable Material: Galvanized Steel, Cold-rolled Steel Strip Width: Below 500mm
Roller: 45# Steel, Quenched Heat Treatment Shaft: 45# Steel, Quenched Heat Treatment
High Light:

Soncap Stud And Track Roll Forming Machine

,

Soncap metal stud roll forming machine

,

1.2mm metal stud roll forming machine

5.5KW Fully Automatic Steel Stud And Track Roll Forming Machine Siemens PLC Controlled

 

 

1. Description of stud and track roll forming machine

 

The studs and track shapes mainly include C shape, U shape, W shape, C shape with holes, L shape, etc. These products are widely used in many kinds of buildings, such as industrial factories, civilian buildings, and wallboard for the attached part product. They have the advantages of pretty appearance, durable using and so on.

 

In the modern building system, metal c stud and u tracks are great inventions in steel building projects, and that makes drywall stud and track roll forming machines, or even all the lightweight or light gauge steel frame roll forming machines highly popular in the international.

 

Due to the technology monopoly, there are rarely Chinese manufacturers can provide steel framing solutions for lightweight or light gauge steel buildings, but for a drywall stud and track roll forming machine production, Chinese manufacturers are no doubt reliable.

 

 

2. Major technical parameters of stud and track roll forming machine

 

No. Item Specification
1 Can Formed Material GI, AL strip, or coil
2 Equipment operation Automatic
3 Voltage 380V 50Hz 3Phase (or custom)
4 The thickness of the sheet (mm) 0.6-1.2mm
5 Material width(mm) As your drawing
6 Yield strength 550Mpa max
7 The size of the roll forming machine 3500mmx1200mmx1400mm
8 Speed 20-30m/min
9 Diameter of shaft 40mm
10 Weight of the Machine 2200-2500KGS
11 Material of rollers Cr12 steel quenched and chromed
12 Motor brand Siemens or Guomao
13 PLC Siemens or Delta or Mitsubishi
14 Total power (kW) 8kw
15 Power of the hydraulic system 4kw
16 Power of main molding core 4kw
17 Transmission Chain with gears

 

 

3. Major components of stud and track roll forming machine

 

Components for stud and track roll forming machine
Name Quantity Units
Decoiler 1 Set
Main Machine Feeding device 1 Set
Roll forming system 1 Set
Cut Equipment 1 Set
Hydraulic system 1 Set
Electric control system 1 Set
Supporter/Automatic Stacker 1 Set

 

 

4. Installation service

 

a. After the machine arrives at the destination, the seller will send a technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist with the installation work.

 

The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.

 

The buyer should arrange the accommodation, food, and traffic in the destination

 

Training period: 2 days. (we can supply training on the operation spot if buyer needs)

 

Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.

 

 

5. Quality Guarantee

 

The Seller shall guarantee the goods with materials and workmanship in accordance with the required on the drawings, brand new, unused, and correspond in all respects with the quality, specification, and performance as stipulated in drawings and guarantee a good smooth operation for 12 months after the date of shipment (except consumables). This guarantee excludes the parts that require normal plant maintenance. The guarantee is strictly limited to the repairing and the replacing of the mechanical parts supplied by us found to be defective provided that failure has occurred during the ordinary use of the equipment and it is not accepted and claim due to damage to people, property, or loss of production.

 

Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine 0

 

Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine 1

 

Soncap 1.2mm Thickness Metal Stud And Track Roll Forming Machine 2

Contact Details
Jiangsu Lebron Machinery Technology Co., Ltd.

Contact Person: Alfred

Tel: +8618115330187

Send your inquiry directly to us (0 / 3000)