Product Details:
|
Main Power: | 5.5KW | Hydraulic Power: | 3KW |
---|---|---|---|
Suitable Material: | Galvanized Steel, Cold-rolled Steel Strip | Width: | Below 500mm |
Roller: | 45# Steel, Quenched Heat Treatment | Shaft: | 45# Steel, Quenched Heat Treatment |
Highlight: | metal stud and track roll forming machine,metal stud making machine |
5.5 KW high-speed stud and track roll forming machine full automatic save manpower
1. Description:
The 5.5KW High-Speed Stud and Track Roll Forming Machines are designed for the automatic manufacturing of C channels continuously. It is widely used for the materials which are produced for light steel structure building systems.
As thin sheets of galvanized steel can be cold-formed into steel studs. In modern buildings, people tend to use steel studs as the main structural components. Most of these steel building materials are manufactured by roll forming machines.
2. Main Technical Parameters
No. | Item | Description |
1 | Suitable Material | Galvanized Steel Strip |
2 | Thickness | 0.6~1.2mm |
3 | Main Power | 5.5KW |
4 | Roller Station | 15 stations |
5 | Roller Material | 45# steel, quenched. Coated with 0.05mm chrome |
6 | Shaft Material | 45# steel, quenched, coated with 0.05mm chrome |
7 | Shaft diameter | 70mm |
3. Workflow:
Decoiler--Feeding--Roll Forming--Hydraulic Cutting--Receiving
4. Main Components
No. | Description | Quantity |
1 | Decoiler | 1 Set |
2 | Roll Forming Unit | 1 Set |
3 | Receiving Tables | 2 Sets |
4 | PLC Control System | 1 Set |
5. Brands of Electrical Appliances
No. | Description | Brand |
1 | PLC | Mitsubishi |
2 | Frequency Converter | Mitsubishi |
3 | Touch Screen | Mitsubishi |
4 | Low Voltage Apparatus | Schneider |
5 | Encoder | Mitsubishi |
6. After Sale Service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
Installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.
7. FAQ
Q1. What is your advantage?
A1: We have over 10 years‘ experience on roll forming machines production. Experienced engineers and workers will be helpful for quality control.
Q2. Do you have after-sales support?
A2: Yes, we are happy to give advice and we also have skilled technicians available across the world. We need your machines running in order to keep your business running.
Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers specifications, using top brand components.
Q4. Can you be responsible for transport?
A5: Yes, please tell me the destination port or address.we have rich experience in transporting.
Q5. How to visit your company?
A5: 1). Fly to Wuxi airport, we will pick you up.
2). Fly to Shanghai Airport: By high-speed train From Shanghai Hongqiao railway station to Wuxi railway station, then we can pick you up.
Contact Person: Mr. Alfred
Tel: 0086 18121549786
Fax: 86-510-82620085