Product Details:
|
Main Power: | 5.5KW | Drive System: | Chain |
---|---|---|---|
Roller Shafts: | No.45 Steel. Diameter: φ60 Mm | Cutter Blade: | Cr12 Steel |
Roller Stations: | 12 Rows | Speed: | 20~25m/min |
High Light: | 20m/min metal stud roll forming machine,Soncap metal stud roll forming machine,20m/min stud roll forming equipment |
Full Automatic High-Speed Stud And Track Forming Machine Steel Construction Usage
1. Description:
Steel Stud and Track Roll forming machines are very popular in the metal base industry, therefore, we provide you with stud and track roll forming machines. This type of roll forming machine is very popular in the metal industrial construction of metal or metal profiles. The construction of the metal industry has always been popular because we have created efficiency for running the metal industry, so we have provided this equipment.
Provide the best stud and track roll forming machine at a reasonable price
2. Main Technical Parameters
No. | Item | Description |
1 | Main Power | 5.5KW |
2 | Drive System | Chain |
3 | Roll Forming Speed | over 20m/min |
4 | Roller Station | 12 stations |
5 | Roller Material | 45# steel, quenched. Coated with 0.05mm chrome |
6 | Shaft Material | 45# steel, quenched, coated with 0.05mm chrome |
7 | Shaft diameter | 70mm |
3. Workflow:
Uncoiling → Feeding & Guiding → Roll Forming → Hydraulic Punching → Servo Tracking Cutting → Receiving
4. Main Components
No. | Name | Quantity |
1 | 3-Ton Decoiler | 1 Set |
2 | Feeding Guider | 1 Set |
3 | Roll Forming Machine Unit | 1 Set |
4 | Hydraulic Punching Device | 1 Set |
5 | Hydraulic Servo Tracking Cutting Device | 1 Set |
6 | Hydraulic Station | 1 Set |
7 | Receiving Table | 1 Set |
8 | Electric Control Cabinet | 1 Set |
5. Brands of Electrical Appliances
No. | Name & Brand | Brand |
1 | PLC | Germany Siemens |
2 | Frequency Converter | Japan Yaskawa |
3 | Touch Screen | Germany Siemens |
4 | Encoder | Japan Omron |
5 | Other Electrical Accessories | France Schneider |
6. After-Sale Service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
Contact Person: Alfred
Tel: +8618115330187