Product Details:
|
Suitable Material: | Galvanized Steel Coil, Color Steel Coil | Thickness: | 0.3-0.8mm |
---|---|---|---|
Voltage: | 380V/50Hz/3Ph (can Custom) | Shaft Diameter: | Dia. 75mm |
Drive Mode: | Chain | Machine Size: | 4000*1000*1200mm |
High Light: | Color Steel profile roll forming machine,CSA profile roll forming machine,Color Steel cold roll forming machine |
High Speed Fully Automatic Hat Shape Roll Forming Machine Light Steel Keel Roll Forming Machine
1. Hat Shape Roll Forming Machine Description:
The Hat Shape Roll Forming Machine can produce hat shape profiles continuously. Comparing with producing by the bending machines, the former is more effective, saving manual costs.
The complete Hat Shape Roll Forming Machine including the Decoiler, Main Roll Forming Machine, The PLC control system, and Ran-out tables. Our roll forming machine equipped with a computer control system. You just need to program in the computer the piece and length you need, then the roll forming machine produces it automatically. The machine is easy to operate and operate stably.
2. Technical Parameters of Hat Shape Roll Forming Machine
No. | Item | Description |
1 | Suitable Material | Galvanized Steel Coil, Color Steel Coil |
2 | Thickness of sheet | 0.3-0.8mm |
3 | Voltage | 380V/50Hz/3Ph (can custom) |
4 | Shaft Diameter | 75mm |
5 | Feeding Width | Approx 104mm |
6 | Machine Size | 4000mm*1000mm*1200mm |
7 | Main Power | 7.5 Kw |
8 | Hydraulic Power | 4 Kw |
9 | Roller Station | 16 stations |
10 | Roller Material | 45# steel. Precision machined. Quenched |
11 | Shaft Material | 45# steel. Precision machined. Quenched |
12 | Drive Mode | Chain |
13 | Forming Speed | Over 18m/min |
14 | Weight | Approx 8 Tons |
3. Main Components of Hat Shape Roll Forming Machine
No. | Name | Unit | Quantity |
1 | Decoiler | set | 1 |
2 | Guider $ Leveler | set | 1 |
3 | Main Roll Forming Machine | set | 1 |
4 | Cutting System | set | 1 |
5 | Output Table | set | 1 |
6 | Control System(PLC) | set | 1 |
7 | Hydraulic station | set | 1 |
4. Our Service
Installation service
a. After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
5. FAQ:
Q: How to maintenance?
A: If using frequently, best coating lubricant on the chain and two ends of the shaft every month, replace the hydraulic oil every 1-2 years.
Q: Can you be responsible for transport?
A: Yes, please tell me the destination port or address. we have rich experience in transport.
Q: Can you make the machine according to my design or phototype?
A: Yes. We have an experienced team for working out the most suitable design and production
Q: Can you supply the raw materials?
A: Yes, we can supply the galvanized steel coil, aluminum steel coil, color steel coil
Q: How is this machine's service life?
A: In normal maintenance, the service life at least 10 years.
Contact Person: Alfred
Tel: +8618115330187