Product Details:
|
Suitable Material: | Galvanized Steel Strip | Thickness: | 0.3~1.0mm |
---|---|---|---|
Main Power: | 5.5 KW | Control System: | PLC Delta Converter |
Roller Station: | 11 Stations | Weight: | Approx 3T |
Highlight: | ceiling channel roll forming machine,keel manufacturing machine |
Steel Frames Ceiling drywall Light Steel Keel Roll Forming Machine Delta PLC Control
1. Description of light steel keel roll forming machine
Now, in the modern building project, light steel keels are more and more widely used. The ceilings and drywall roll forming machine, or even all the lightweight or light gauge steel frame roll forming machines are highly popular in the international.
A light steel keel roll forming machine has been designed for the automatic manufacturing of the light steel keels continuously for light gauge or lightweight steel building systems.
The complete Light Steel Keel Roll Forming Machine including the Decoiler, Main Roll Forming Machine, The PLC control system and Ran-out tables. The roll forming machine equipped with a PLC computer control system. You just need to program in the computer the piece and length data, then the roll forming machine produces it automatically.
2. Main technical parameters of the light steel keel roll forming machine
Technical Parameters: | ||
1 | Name of commodity & specification | Light Steel Keel Roll Forming Machine |
2 | Main motor power | 5.5 KW |
3 | Hydraulic motor power | 3 KW |
4 | Hydraulic Pressure | 10-12MPa |
5 | Voltage | 380V /3phase/ 50 HZ (can custom) |
6 | Control System | PLC Delta Converter |
7 | Main Frame | 300mm H-Beam |
8 | Backboard Thickness | 18mm |
9 | Chain Size | 20mm |
10 | Feeding Material | color steel coils |
11 | Feeding Thickness | 0.3-1.0mm |
12 | Productivity | 12m~20m/min |
13 | Roll Station | 11 or custom |
14 | Roller Diameter | 70mm |
15 | Roller material | 45# steel |
16 | Cutter material | Cr12 , quenched |
17 | Cr-Plating Size | 0.05mm |
18 | Overall Size | 3.0×0.8×1.0m |
19 | Total Weight | 3T |
3. Main technical parameters of stud and track roll forming machine
No. | Item | Quantity (Set) |
1 | Manual Uncoiler | 1 |
2 | Guiding Platform | 1 |
3 | Coil Strip Leveler | 1 |
4 | Main Machine of Roll Forming | 1 |
5 | Electric-Motor | 1 |
6 | Cutting Device | 1 |
7 | Hydraulic Station | 1 |
8 | PLC Control | 1 |
9 | Supporter Table | 1 |
4. Installation service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
Installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.
Contact Person: Mr. Alfred
Tel: 0086 18121549786
Fax: 86-510-82620085