Product Details:
|
Main Power: | 7.5KW | Hydraulic Power: | 4KW |
---|---|---|---|
Forming Speed: | 12~15m/min | Drive Mode: | Chain |
Roller Station: | 18 Stations | Voltage: | 380V/50Hz/3Ph (can Custom) |
High Light: | Chain Drive half round gutter machine,12m/Min half round gutter machine,18 Stations half round gutter machine |
YX90-150 Type Fully Automatic Half Round Gutter Steel Gutter Roll Forming Machine
1. Description of steel gutter roll forming machine:
Steel gutter roll forming machine is used for the production of the metal gutters, which are widely used in modern villas and multiple raises buildings. Lebron-Machinery is producing high-quality steel gutter roll forming machines and exports them to India, Vietnam, Indonesia, Thailand, Egypt, etc.
2. Main parameter of steel gutter roll forming machine
No. | Main Technical Parameters | |
1 | Suitable Raw Material | GI, GL, PPGI, PPGL Coil |
2 | Width | 200-600mm |
3 | Thickness | 0.4-0.6mm |
4 | Roller station | 18 stations |
5 | Dimensions | Approx 8.0*1.0*1.2m |
6 | Main Power | 7.5kw |
7 | Forming speed | 12~15m/min |
8 | Diameter of the shaft | 75mm |
9 | Weight | About 6.5 Tons |
10 | Voltage | 380V 50Hz 3phases |
11 | Rolling material | No. 45# with hard chrome and quenched |
12 | Material of the cutting plate | Cr12 Steel |
13 | Control system | PLC control |
2. Main Components
COMPONENT FOR STEEL GUTTER Roll Forming Machine | |||
Name | Quantity | Units | |
Decoiler | 1 | Set | |
Main Machine | Feeding device | 1 | Set |
Roll forming system | 1 | Set | |
Cut Equipment | 1 | Set | |
Hydraulic system | 1 | Set | |
Electric control system | 1 | Set | |
Supporter/Automatic Stacker | 1 | Set |
3. Our Service:
A. Foreign debugging
If you need, we will arrange for our professional engineers to help you install and debug the machines well. The buyer should pay $60 per day
B. Guarantee period
The warranty will be a maintenance, maintain in the guarantee period of 18 months starting from delivery. Because of the quality of equipment during the guarantee period, we will provide the parts free of charge, which is in the conditions of correct operation. (Natural disasters or factors which can’t be forced by human are excluded).
C. Training
During the installation and adjustment of the equipment, our engineers shall provide the training to
the buyer’s personal request to operate and maintain the equipment. Including foundation construction, electrical works, hydraulic oil, safe operation, and non-standard safety items, testing material and etc.
the expense of accommodation, and traffic for the buyer's men.
Contact Person: Alfred
Tel: +8618115330187