Send Message
Home ProductsGutter Roll Forming Machine

Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed

Certification
China Jiangsu Lebron Machinery Technology Co., Ltd. certification
China Jiangsu Lebron Machinery Technology Co., Ltd. certification
Customer Reviews
Nice factory. Nice service!!!!

—— Nick

Lebron-Machinery is a very good company!

—— Kadasanwan

I'm Online Chat Now

Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed

Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed
Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed

Large Image :  Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed

Product Details:
Place of Origin: Jiangsu, China
Brand Name: LBM
Certification: ISO 9001: 2008
Model Number: LBM-MGM-Model 05
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: Negotiation
Packaging Details: Standard Export Packing with each machine tied and protected in the container
Delivery Time: 35 days
Payment Terms: L/C, T/T, D/A, D/P, Western Union, MoneyGram
Supply Ability: 30 Sets per Month

Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed

Description
Suitable Material: GI, GL, Copper, Aluminum Coil Thickness: 0.3mm ~ 0.8mm
Forming Speed: 8~15m/min Roller Material: 45# Steel, Coated With Chrome, Quenched
Roller Station: 16~18 Stations Shaft Dia: 80mm
Cutting Material: Cr12 Steel, Coated With Chrome, Quenched Main Power: 4 Kw + 4 Kw
Weight: 6 Ton
High Light:

rain gutter roll forming machine

,

half round gutter machine

Automatic Durable Half Round Metal Gutter Roll Forming Machine with high efficency

 

 

 

1. Description of Half Round Roll Forming Machine

 

Half Round Galvanized gutters have been around for decades because of their strength and corrosion resistance. Heavy gauge steel hot dipped with zinc gives the gutter both added strength and superior resistance to the elements.


It is known to that entire half round gutters are attached to the roof edges and used to draw water down and away from the house and its foundation. Most gutters consist of sections of gutter, drop outlets and downspouts. Gutters can be constructed out of Aluminum, Copper, Galvalume, Galvanized Steel, Copper penny Aluminum, freedom gray copper, preweathered zinc, copperplus, designer copper aluminum, lead coated copper, paint grip steel.


For the design, we do some innovative range of gutter machines for the production of half round gutters with traditional profiles and width 280, 333 and 400 mm. there are two types: one sizes or linear sizes.

 

Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed 0Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed 1Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed 2

 

2. Technical Parameter of Half Round Roll Forming Machine

 

No. Half Round Gutter Roll Forming Machine
1 Suitable material GI, GL, Copper, Aluminum Coil
2 Width of material 530 mm or customized
6 Thickness of material 0.3-0.8mm, customized
2 Working speed 8~15m/min
3 Main Motor power 4 Kw
4 Hydraulic station power 4 Kw
5 Electrical control system PLC control system
7 Shaft diameter 80mm
8 Roller station 16~18 stations
10 Dimension Approx 8000x1200x1500mm
11 Weight Approx 4 Ton
12 Voltage 380V 3phase 50HZ or as the customer's requirements
13 Material of roller 45# Steel, coated with Chrome, quenched to HRC 58-62 
14 Material of cutting Cr12 steel with quenched treatment
15 Working time Can be 24 hours
16 Workers 1-2 only

 

 

3. After Sale Service

 

A. Foreign debugging

If you need, we will arrange our professional engineers to help you install and debug the machines well. Buyer should pay $60 per day

 

B. Guarantee period

The warranty will be maintenance, maintain in the guarantee period of 18 months starting from delivery. Because of the quality of equipment during guarantee period, we will provide the parts free of charges, which is in the conditions of correct operation. (Natural disasters or factors which can’t forced by human are excluded).

 

C. Training

During installation and adjustment of the equipment, our engineers shall provide the training to

buyer’s personnel request to operate and maintain the equipment. Including foundation construction, electrical works, hydraulic oil, safe operation and non-standard safety items, testing material and etc.

 

D. Lifetime services

Life time services to every customer.

 

 

4. Application

 

Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed 3

 

 

Half Round Metal Gutter Rolling Machine High Efficency 8~15m/min Forming Speed 4

 

 

 

Contact Details
Jiangsu Lebron Machinery Technology Co., Ltd.

Contact Person: Mr. Alfred

Tel: 0086 18121549786

Fax: 86-510-82620085

Send your inquiry directly to us (0 / 3000)