Product Details:
|
Main Power: | 7.5KW | Size: | 7.5*1.2*1.0m |
---|---|---|---|
Weight: | Approx. 8tons | Speed: | 20-25m/min |
Roller: | 45# Steel, Coated With Hard Chrome | Roller Station: | 18 Stations |
High Light: | 4KW Durable Door Roll Forming Machine,Durable Door Roll Forming Machine Automatic,15m/min Door Roll Forming Machine |
High Quality High Efficiency Durable Fully Automatic Door Frame Roll Forming Machine
1. Description of Door Frame Roll Forming Machine
The door frame forming machine is a roll forming machine used in the steel plate cold forming industry. It can continuously shape the steel plate through an automatic press according to the customer's requirements and cut flies to a certain length.
The machine consists of a decoiler, feeding device, leveling device, cold-rolling forming, hydraulic cutting, receiving system, electrical control system, and hydraulic system. It has the advantages of high production efficiency, a high degree of automation, and low labor intensity.
Lebron-Machinery is manufacturing high quality Door Frame Roll Forming Machines, and most of the machines are exported to Australia, the UK, Ireland, Mexico, Brazil, Israel, Dubai, Russia, India, Taiwan, Singapore, Malaysia, Thailand, Philippines, Myanmar, Vietnam, South Africa, Mozambique, Zambia, Zimbabwe, Nigeria, Egypt, Sudan, etc.
2. Technical Parameters of Door Frame Roll Forming Machine
Weight | About 6000kgs |
Size | About 7.5m*1.2m*1.0m (L x W x H) |
Suitable Material | Galvanized steel strip |
Thickness | 0.8~1.2mm |
Coil width | 240mm |
Yield strength | 235Mpa |
Rollers station | 18 Stations |
Roller Shaft Diameter | 75 mm |
Roll Forming Speed | 20-25m/min |
Production Speed | Approx.15m/min |
Roller Material | 45# steel, coated with chrome, quenched |
Cutter material | Cr12 mold steel, with quenched treatment |
Controlling system | PLC and Converter |
Electric power requirement | Main power: 7.5 KW |
Hydraulic power: 4 KW | |
Electric voltage | 380V 50Hz 3 Phase (as per local requirement) |
3. Main components of Door Frame Roll Forming Machine
Name | Quantity |
Uncoiler | 1set |
Coil sheet guiding device | 1set |
Main roll forming system | 1set |
Punching device | 1set |
Cutting device | 1set |
Hydraulic station | 1set |
PLC control system | 1set |
Support table | 1set |
4. Our Service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, and foundation position of the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if the buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
5. FAQ
1. Q: How to visit our company:
A: 1). Fly to Wuxi Airport directly;
2). By fast train From Shanghai Hongqiao station to Wuxi station, then we can pick up you at our factory.
2. Q: What should I provide if I want to customize the machine?
A: You need to provide the profile drawing, material, thickness, voltage, and your special requirements. Then, our technology team will analyze and offer you a suitable technical proposal.
3. Q: What is the Warranty?
A: 12 months
4. Q: What can you do if the machine is broken?
A: Our machine's warranty period is 12 months, if the broken parts can't repair, we will send new free parts to replace the broken parts. You need to pay the cost of the machine that exceeds the warranty period. we can negotiate to solve the problem, and we supply technical support for the whole life of the equipment.
5. Q: If need a technician to the workshop to debug and teach, how to do it?
A: We can send technicians to your country to install the machine. The buyer should bear the expenses including visa, round trip ticket, and suitable accommodation, also the buyer should pay a salary of 100 USD/day.
Contact Person: Alfred
Tel: +8618115330187