Home ProductsDoor Frame Roll Forming Machine

Stable Running Door Frame Roll Forming High Efficiency Fully Automatic

Certification
China Jiangsu Lebron Machinery Technology Co., Ltd. certification
China Jiangsu Lebron Machinery Technology Co., Ltd. certification
Customer Reviews
Nice factory. Nice service!!!!

—— Nick

Lebron-Machinery is a very good company!

—— Kadasanwan

I'm Online Chat Now

Stable Running Door Frame Roll Forming High Efficiency Fully Automatic

Stable Running Door Frame Roll Forming High Efficiency Fully Automatic
Stable Running Door Frame Roll Forming High Efficiency Fully Automatic
Stable Running Door Frame Roll Forming High Efficiency Fully Automatic Stable Running Door Frame Roll Forming High Efficiency Fully Automatic Stable Running Door Frame Roll Forming High Efficiency Fully Automatic Stable Running Door Frame Roll Forming High Efficiency Fully Automatic Stable Running Door Frame Roll Forming High Efficiency Fully Automatic

Large Image :  Stable Running Door Frame Roll Forming High Efficiency Fully Automatic

Product Details:
Place of Origin: Wuxi, Jiangsu, China
Brand Name: Lebron-Machinery
Certification: ISO 9001: 2008
Model Number: Door Frame Roll Forming Machine
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: USD10000~20000 per Set
Packaging Details: Standard Export Packing
Delivery Time: 30 Working Days
Payment Terms: L/C, T/T
Supply Ability: 35 Sets per Month

Stable Running Door Frame Roll Forming High Efficiency Fully Automatic

Description
Main Power: 7.5KW Size: 7.5*1.2*1.0m
Weight: Approx. 8tons Speed: 20-25m/min
Roller: 45# Steel, Coated With Hard Chrome Roller Station: 18 Stations
High Light:

Hydraulic Cutting Door Frame Forming Machine

,

1.5mm Door Frame Forming Machine

,

Door Frame Forming Machine HRC58

Durable And Stable Running Fully Automatic Door Frame Roll Forming High Efficiency

 

 

1. Description of Door Frame Roll Forming Machine

 

This Door Frame Roll Forming machine can produce various kinds of Roll Formed Aluminum & GI Steel Door or Window frames.

 

A door frame roll forming machine generally consists of a decoiler (a Hydraulic Decoiler is optional), a main roll forming unit, a transmission system, a cutting tool, a hydraulic system, a hydraulic oil pump, a PLC control cabinet, and run-out tables

 

Lebron-Machinery is manufacturing high-quality door frame machines, and they are mostly exported to foreign countries, such as India, Angola, Ethiopia, Ghana, Zambia, Brazil, Argentina, Thailand, Philippines, Pakistan, Russia, etc.

 

 

2. Technical Parameters of Door Frame Roll Forming Machine

 

No. Item Description
1 Suitable Plate Material Thickness: 0.8-1.5mm, Galvanized steel coil
2 Working Speed 12-15 m/min
3 Roller quantity 18 rollers
4 Material of Roller Gcr15, Quench HRC58-62 Plated Chrome
5 Material of Shaft 45# Advanced Steel (Diameter: 76mm), thermal refining
6 Driven system Chain drive
7 Main Power with reducer 7.5KW
8 Cutting model: Hydraulic Cutting Cr12mov
9 Material of Cutting blade Cr12Mov, Quench HRC58-62
10 Hydraulic Station Power 4.0 KW
11 Operation system Controlled by industry computer-PLC system.
12 PLC brand Siemens with Japan English and Chinese Language
13 Touch Screen Siemens Japan
14 Encoder Omron, Japan
15 Electric parts Schneider

 

 

3. Main components of Door Frame Roll Forming Machine

 

Name Quantity
Uncoiler 1set
Coil sheet guiding device 1set
Main roll forming system 1set
Punching device 1set
Cutting device 1set
Hydraulic station 1set
PLC control system 1set
Support table 1set

 

 

4. Our Service

 

Installation service

 

After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.

 

The installation period is around 5 days. The buyer should have been prepared for the steel sheet, and foundation position of the machine before the seller’s technician's departure.

 

The buyer should arrange the accommodation, food, and traffic in the destination

 

Training period: 2 days. (we can supply training on the operation spot if the buyer needs)

 

Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.

 

 

5. FAQ

 

Q: How to maintain it?

A: If used frequently, best coating lubricant on the chain and two ends of the shaft every month, replace the hydraulic oil every 1-2 years.

 

Q: Can you be responsible for transport?

A: Yes, please tell me the destination port or address. we have rich experience in transport.

 

Q: Can you make the machine according to my design or phototype?

A: Yes. We have an experienced team for working out the most suitable design and production

 

Q: Can you supply the raw materials?

A: Yes, we can supply the galvanized steel coil, aluminum steel coil, color steel coil

 

Q: How is this machine's service life?

A: In normal maintenance, the service life is at least 10 years.

 

 

Stable Running Door Frame Roll Forming High Efficiency Fully Automatic 0

 

Stable Running Door Frame Roll Forming High Efficiency Fully Automatic 1

 

Stable Running Door Frame Roll Forming High Efficiency Fully Automatic 2

 

Contact Details
Jiangsu Lebron Machinery Technology Co., Ltd.

Contact Person: Alfred

Tel: +8618115330187

Send your inquiry directly to us (0 / 3000)