Home ProductsDoor Frame Roll Forming Machine

7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed

Certification
China Jiangsu Lebron Machinery Technology Co., Ltd. certification
China Jiangsu Lebron Machinery Technology Co., Ltd. certification
Customer Reviews
Nice factory. Nice service!!!!

—— Nick

Lebron-Machinery is a very good company!

—— Kadasanwan

I'm Online Chat Now

7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed

7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed
7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed
7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed 7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed 7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed 7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed 7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed

Large Image :  7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed

Product Details:
Place of Origin: Wuxi, Jiangsu, China
Brand Name: Lebron-Machinery
Certification: ISO 9001: 2008
Model Number: Door Frame Roll Forming Machine
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: USD10000~20000 per Set
Packaging Details: Standard Export Packing
Delivery Time: 30 Working Days
Payment Terms: L/C, T/T
Supply Ability: 35 Sets per Month

7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed

Description
Main Power: 7.5KW Size: 7.5*1.2*1.0m
Weight: Approx. 8 Tons Speed: 20-25m/min
Roller: 45# Steel, Coated With Hard Chrome Roller Station: 18 Stations
High Light:

Door Frame Roll Forming Machine 25m/min

,

7.5KW Steel Door Roll Forming Machine

,

chrome coated Frame Roll Forming Machine

Exported High-Quality High-Speed Steel Door Frame Roll Forming Machine

 

 

1. Description of Door Frame Roll Forming Machine

 

This Door Frame Roll Forming machine can produce various kinds of Roll Formed Aluminum & GI Steel Door or Window frames.

 

A door frame roll forming machine generally consists of a decoiler (a Hydraulic Decoiler is optional ), the main roll forming machine, a transmission system, a cutting tool, a hydraulic system, a hydraulic oil pump, a PLC control cabinet, and run-out tables

 

The punching also can be designed according to your needs. the door frame surface will be very smooth and beautiful without any scratches on the surface.

 

LBM factory manufacturing high-quality window frame machines, and they are mostly exported to foreign countries, such as Australia, UK, Ireland, Mexico, Brazil, Israel, Dubai, Russia, India, Taiwan, Singapore, Malaysia, Thailand, Philippines, Myanmar, Vietnam, South Africa, Mozambique, Zambia, Zimbabwe, Nigeria, Egypt, Sudan, etc.

 

 

2. Technical Parameters of Door Frame Roll Forming Machine

 

No. Item Description
1 Suitable Plate Material Thickness: 0.8-1.5mm, Galvanized steel coil
2 Working Speed 12-15 m/min
3 Roller quantity 18 rollers
4 Material of Roller Gcr15, Quench HRC58-62 Plated Chrome
5 Material of Shaft 45# Advanced Steel (Diameter: 76mm), thermal refining
6 Driven system Chain drive
7 Main Power with reducer 7.5KW
8 Cutting model: Hydraulic Cutting Cr12mov
9 Material of Cutting blade Cr12Mov, Quench HRC58-62
10 Hydraulic Station Power 4.0 KW
11 Operation system Controlled by industry computer-PLC system.
12 PLC brand Siemens with Japan English and Chinese Language
13 Touch Screen Siemens Japan
14 Encoder Omron, Japan
15 Electric parts Schneider

 

 

3. Main components of Door Frame Roll Forming Machine

 

Name Quantity
Uncoiler 1set
Coil sheet guiding device 1set
Main roll forming system 1set
Punching device 1set
Cutting device 1set
Hydraulic station 1set
PLC control system 1set
Support table 1set

 

 

 

4. Our Service

 

Installation service

 

After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.

 

The installation period is around 5 days. The buyer should have been prepared for the steel sheet, and foundation position of the machine before the seller’s technician's departure.

 

The buyer should arrange the accommodation, food, and traffic in the destination

 

Training period: 2 days. (we can supply training on the operation spot if the buyer needs)

 

Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.

 

 

 

5. Our Advantages


1). We are a factory with over 10 years of experience in manufacturing Roll Forming Machines;

 

2). We have our own powerful research and development team

 

3). We have more than 15 technicians.

 

4). 5 engineers with more than 20 years of experience

 

5). We have an advanced Laser Cutting Machine, CNC Machining Center, Polishing Line, Painting Line, etc. This advanced production equipment guarantees the good quality of each part and the appearance of our machines;

 

6). Our machines have reached the International Inspection Standards;

 

 

6. FAQ

 

Q: How to visit our company:

A: 1). Fly to Wuxi Airport directly;

2). By fast train From Shanghai Hongqiao station to Wuxi station, then we can pick up you at our factory.

 

Q: What should I provide if I want to customize the machine?

A: You need to provide the profile drawing, material, thickness, voltage, and your special requirements. Then, our technology team will analyze and offer you a suitable technical proposal.

 

3. Q: What is the Warranty?

A: 12 months

 

4. Q: What can you do if the machine is broken?

A: Our machine's warranty period is 12 months, if the broken parts can't repair, we will send new free parts to replace the broken parts. You need to pay the cost of the machine that exceeds the warranty period. we can negotiate to solve the problem, and we supply technical support for the whole life of the equipment.

 

5. Q: If need a technician to the workshop to debug and teach, how to do it?

A: We can send technicians to your country to install the machine. The buyer should bear the expenses including visa, round trip ticket, and suitable accommodation, also the buyer should pay the salary of 120 USD/day.

 

7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed 0

 

7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed 1

 

7.5KW Steel Door Frame Roll Forming Machine 25m/Min High Speed 2

 

Contact Details
Jiangsu Lebron Machinery Technology Co., Ltd.

Contact Person: Alfred

Tel: +8618115330187

Send your inquiry directly to us (0 / 3000)