Home ProductsDoor Frame Roll Forming Machine

Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel

Certification
China Jiangsu Lebron Machinery Technology Co., Ltd. certification
China Jiangsu Lebron Machinery Technology Co., Ltd. certification
Customer Reviews
Nice factory. Nice service!!!!

—— Nick

Lebron-Machinery is a very good company!

—— Kadasanwan

I'm Online Chat Now

Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel

Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel
Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel
Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel

Large Image :  Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel

Product Details:
Place of Origin: Wuxi, Jiangsu, China
Brand Name: Lebron-Machinery
Certification: ISO 9001: 2008
Model Number: Door Frame Roll Forming Machine
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: USD10000~20000 per Set
Packaging Details: Standard Export Packing
Delivery Time: 30 Working Days
Payment Terms: L/C, T/T
Supply Ability: 35 Sets per Month

Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel

Description
Main Power: 7.5KW Size: 7.5*1.2*1.0m
Weight: Approx. 8tons Speed: 20-25m/min
Roller: 45# Steel, Coated With Hard Chrome Roller Station: 18 Stations
High Light:

240mm Door Frame Roll Forming Machine

,

Door Frame Roll Forming Machine 4KW

,

chrome Door Frame Roll Forming Machine

Fully Automatic Easy Operation High-Speed Steel Door Frame Roll Forming Machine

 

 

1. Description of Door Frame Roll Forming Machine

 

A door frame roll forming machine generally consists of a decoiler (a Hydraulic Decoiler is optional ), the main roll forming machine, a transmission system, a cutting tool, a hydraulic system, a hydraulic oil pump, a PLC control cabinet, and run-out tables

 

This Door Frame Roll Forming machine can produce various kinds of Roll Formed Aluminum & GI Steel Door or Window frames.

 

The punching also can be designed according to your needs. the door frame surface will be very smooth and beautiful without any scratches on the surface.

 

Lebron-Machinery is manufacturing high-quality door frame machines, and they are mostly exported to foreign countries, such as Australia, UK, Ireland, Mexico, Brazil, Israel, Dubai, Russia, India, Taiwan, Singapore, Malaysia, Thailand, Philippines, Myanmar, Vietnam, South Africa, Mozambique, Zambia, Zimbabwe, Nigeria, Egypt, Sudan, etc.

 

 

2. Technical Parameters of Door Frame Roll Forming Machine

 

Weight About 6000kgs
Size About 7.5m*1.2m*1.0m (L x W x H)
Suitable Material Galvanized steel strip
Thickness 0.8~1.2mm
Coil width 240mm
Yield strength 235Mpa
Rollers station 18 Stations
Roller Shaft Diameter 75 mm
Roll Forming Speed 20-25m/min
Production Speed Approx.15m/min
Roller Material 45# steel, coated with chrome, quenched
Cutter material Cr12 mold steel, with quenched treatment
Controlling system PLC and Converter
Electric power requirement Main power: 7.5 KW
Hydraulic power: 4 KW
Electric voltage 380V 50Hz 3 Phase (as per local requirement)

 

 

3. Main components of Door Frame Roll Forming Machine

 

Name Quantity
Uncoiler 1set
Coil sheet guiding device 1set
Main roll forming system 1set
Punching device 1set
Cutting device 1set
Hydraulic station 1set
PLC control system 1set
Support table 1set

 

 

4. Our Service

 

Installation service

 

After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.

 

The installation period is around 5 days. The buyer should have been prepared for the steel sheet, and foundation position of the machine before the seller’s technician's departure.

 

The buyer should arrange the accommodation, food, and traffic in the destination

 

Training period: 2 days. (we can supply training on the operation spot if the buyer needs)

 

Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.

 

 

5. FAQ

 

1). Q: Are you a manufacturer, or trading company?

A: We are a manufacturer, and we have built up our company since 2007.

 

2). Q: Where is your factory located?

A: Our factory address is: No. 551, Zhenze West Road, Huazhuang Street, Binhu District, Wuxi City, Jiangsu, China

 

3). Q: How can I get to your factory?

A: Our factory is near Shanghai Airport, we can pick you up at the airport. Or you can by plane direct to Wuxi airport. We can pick you up.

 

4). Q: If I will need to stay at your place for a few days, is that possible to book the hotel for me?

A: It’s always my pleasure, a hotel booking service is available.

 

 

Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel 0

 

 

Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel 1

 

 

Easy Operation Door Frame Roll Forming Machine 240mm High Speed Steel 2

 

 

Contact Details
Jiangsu Lebron Machinery Technology Co., Ltd.

Contact Person: Alfred

Tel: +8618115330187

Send your inquiry directly to us (0 / 3000)