Product Details:
Payment & Shipping Terms:
|
Size: | 3700*800*1100mm | Weight: | 2500KGS |
---|---|---|---|
Servo Motor Power: | 7.5KW | Hydraulic Power: | 7.5KW |
Voltage: | 380V/50HZ/3PH | Material: | G300-G550 Zinc Plated, Aluminum-zinc Plated Coil |
High Light: | metal framing machine,light steel frame machine |
Fast speed green color F89 light gauge steel framing machine prefabricated house
1. Description of C89 type Light Gauge Steel Framing machine
This Light Gauge Steel Framing Machine is for producing the studs and tracks which are used in light gauge steel structure buildings. The studs and tracks which are produced by the Light Gauge Steel Framing Machine are light. The building steel structure can be quickly built without normal heavy tools and equipment. Every component can be easily carried by hand. The main tool is a light, hand-held screw gun. Because the steel is strong, LGS structures are lighter than wood framed structures of equivalent strength.
The normal speed of this Light Gauge Steel Framing Machine can reach 300-700/hour, but the max speed can reach 2800m/hour. The punching hole accuracy is +/-0.5mm. This machine can continuously work without any jams
2. Main technical data of LGS Framing Machine
Size | 3700*800*1100mm |
Weight | 2500KGS |
Main Servo Motor Power | 7.5KW |
Hydraulic Power for Punching & Cutting | 7.5KW |
Forming Steps | 7 steps roll forming+2 steps reshaping |
Processing Speed |
Typical Drywall Panel Frame 600-720m/h Roll Forming Speed without punch:2700m/h Over All Production Capacity:4-5tons/8hours |
Voltage | 380V/50HZ/3PH |
Height | 38mm |
Width | 89mm |
Lip of C Profile | 10mm |
Tolerance Of Cutting & Punching | ±0.5mm |
Tolerance Of Forming | 0.75mm |
Forming Thickness | 0.7mm -1.2mm |
3. Main Accessories of LGS Framing Roll Forming Machine
No. | Description |
1 | Main Forming Machine |
2 | 1.5T Hydraulic Strip Uncoiler |
3 | Automatic Punching Device |
4 | Hydraulic Motor System |
5 | IPC Computer Controlling System with Product Software |
6 | Hydraulic Post-cutter |
7 | Automatic Printing Device |
8 | Vertex BD Design Software |
9 | Run Out Table |
10 | Tools |
11 | Operation Manual |
4. Installation service
a. After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
b. Installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before seller’s technician's departure.
c. The buyer should arrange the accommodation, food, and traffic in the destination
d. Training period: 2 days. (we can supply training on the operation spot if buyer needs)
e. With in 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.
Contact Person: Alfred
Tel: +8618121549786
Solar Industry Automatic Roll Forming Machine 380V 50Hz With Heavy Punch Press
Full Automatic Strut Channel Roll Forming Machine , Solar Support Channel Roll Forming Machine
Full Automatic Strut Channel Roll Forming Machine 8.5kW Hydraulic Station Power
PLC Control Automatic Strut Channel Roll Forming Machine Hydraulic Cutting Device
High Efficiency Light Steel Frame Machine Easy Operation 7.5kW Main Motor Power
380V 50Hz 3Ph Light Gauge Steel Framing Machines , Orange Color Steel Framing Equipment
4900 Meter Light Gauge Steel Framing Machines Blue Color For LGS Structure Houses
4900mm Steel Framing Machine 0.75-1.2mm Thickness For Pre Engineered Buildings
PLC Control Stud And Track Roll Forming Machine , Full Automatic Stud Making Machine
U Shape Drywall Stud And Track Roll Forming Machine CE Certified Lightweight System
Light Gauge Steel Stud Machine 7.5KW 380V / 50Hz High Efficiency Easy Maintenance
5.5 KW U C Stud Roll Forming Machine High Productivity With PLC Delta Converter