Product Details:
|
Suitable Material: | GI, GL Coil | Forming Speed: | Approx 8~12m/min |
---|---|---|---|
Shaft Material: | 45# Steel Quenched, Coated Chrome | Roller Station: | 18 Stations |
Main Power: | 11 Kw | Voltage: | 380V, 50Hz, 3 Phase() |
High Light: | steel door frame roll forming machine,steel door frame manufacturing machines |
Panasonic PLC Control Automatic Door Frame Roll Forming Machine Long Time Service
1. Product description
1.Suitable material | Color steel, galvanized steel |
2.Main frame structure | 300H steel |
3.Main motor power | 5.5KW |
4.Hydraulic station power | 4KW |
5. Side borad thickness | 16mm |
6.Thickness of material | 1mm~2mm |
7.Diameter of principal axis | Φ60mm |
8.Material expand width | 95-142mm |
9.Electric tension | 380V 3phase 50HZ or as the customer's requirements |
10.Material of roller | High grade 45# forged steel plated with hard chrome plating |
11.Controlling system | PLC |
12.Processing speed | 6-10m/min |
13.Processing precision within | 1.00mm (depend on design) |
14.Material of cutting blade | Cr12 mould steel with quenched treatment |
15.Drive | By chain |
16.Chain specification | 1.2 inch |
17.Rollers | 10rows |
18.Machine weight | about3Tons |
2.Main Accessories
Serial No. | Commodity | QUANTITY |
1 | manual de-coiler | 1 SET |
2 | feeding guide and hydraulic punching device | 1 SET |
3 | main roll forming machine | 1 SET |
4 | hydraulic cutting device | 1 SET |
5 | output table | 1 SET |
6 | computer controlling cabinet | 1 SET |
7 | hydraulic station | 1 SET |
3. Advantage:
- This EU type of light gauge steel roll forming machine line include 3 tons of manual decoiler, roll forming host, PLC control system, hydraulic cutting system and output table
- The manual decoiler is free for each machine, it can hold 3 tons of strips, and normally the space between manual decoiler and the machine is 3 meters.
- Feeding table has 1 row of roller to make the strip flat, and the roll forming host can produce the light keels as per customer's request.
4. After Sale Service
A. Foreign debugging
If you need, we will arrange our professional engineers to help you install and debug the machines well. Buyer should pay $60 per day
B. Guarantee period
The warranty will be maintenance, maintain in the guarantee period of 18 months starting from delivery. Because of the quality of equipment during guarantee period, we will provide the parts free of charges, which is in the conditions of correct operation. (Natural disasters or factors which can’t forced by human are excluded).
C. Training
During installation and adjustment of the equipment, our engineers shall provide the training to
buyer’s personnel request to operate and maintain the equipment. Including foundation construction, electrical works, hydraulic oil, safe operation and non-standard safety items, testing material and etc.
D. Lifetime services
Life time services to every customer.
5. FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
Contact Person: Mr. Alfred
Tel: 0086 18121549786
Fax: 86-510-82620085